Readiness programme · early adopters · draft bill UD437

Readiness Ready-mix concrete is not yet covered by SENT under the law in force. We are building a list of plants that want their e-WZ, processes and integrations ready — before the rules (draft bill UD437) take effect.

Get your batching plant ready before SENT covers concrete

SENTBeton is a toolkit for ready-mix producers and mixer truck fleets: a dispatcher console, a driver app, a fulfilment link and an API. No web panel for daily work. You join as an early adopter — we deploy the processes and documents now, and adapt SENT messaging once the final wording of the act stabilises.

Join the early adopters Download a sample e-WZ (PDF) See a single delivery run

EN 206-compliant e-WZ, dispatcher console and driver app — already available, try them today. Fulfilment link and API — arranged at onboarding. No promised date for the legal obligation.

e-WZ is ready — a complete EN 206 document

Our digital e-WZ replaces the paper delivery ticket from the batching plant. The document is generated before the mixer truck leaves, carries the full set of mix parameters, and is ready to be shown en route — even before the recipient signs.

What a single run looks like

A typical day at the plant: the dispatcher plans the dispatches, the mixer truck heads to the site, the recipient confirms the delivery, and the system closes the documents and the PUESC communication.

  1. Plan and WZ issue On the dispatcher console: mix design / concrete class, volume (m³), WZ number, vehicle, driver, site address and the time window.
  2. Run start The driver gets the job in the app or a one-off link (SMS / WhatsApp / e-mail from the sentbeton.pl domain). No browser account needed.
  3. SENT report At departure the system prepares and sends the transport report (incl. SENT-100) linked to the WZ. For mixer trucks — no OBU/ZSL locator required.
  4. On site: e-WZ The recipient signs the confirmation on a phone. A digital record remains (POD / e-WZ) with the time and run data.
  5. Closure and outages After delivery the SENT report is closed. When the PUESC gateway is down — outage mode based on the WZ, resubmitted once connectivity returns (substantive responsibility stays with the producer).

What SENTBeton consists of

One platform, several touchpoints — so dispatch, the driver and the plant's ERP don't have to live in a browser.

Available

Dispatcher console

SENTBeton Dispatcher desktop app (Windows, macOS, Linux).

  • issuing e-WZ and planning runs
  • SENT statuses and report history
  • roadside inspection / outage mode
  • PUESC settings and mixer fleet

Available

Driver app

SENTBeton Driver for Android (iOS in the queue).

  • run list and navigation to the site
  • recipient signature on the spot
  • offline work with later synchronisation
  • roadside-inspection screen / emergency WZ

Available

Fulfilment link

A one-off address from SMS, WhatsApp or e-mail — no installation.

  • WZ details and site address
  • arrival confirmation
  • digital signature on site
  • links from the sentbeton.pl domain

For plant IT

Integrator API

An open API for connecting the ERP / batching dispatch system.

  • creating orders / dispatches from outside
  • status and document webhooks
  • WZ attachments, signatures, SENT metadata
  • the same backend as the console and the app

Integration without a “web panel”

Daily work runs through the console, the driver app, links and the API. The sentbeton.pl site is for information and contact — not for dispatcher sign-in. API documentation and a test account are arranged at onboarding (kontakt@sentbeton.pl).

SENT for concrete — preparation under draft bill UD437

After the veto of the earlier amendment, the government returned to the topic with draft bill UD437 (incl. concrete in mixer trucks, with no OBU/ZSL locator in the assumptions). It is still a draft — not binding law. Below are the areas we address in the product so the plant can enter the obligation calmly rather than “overnight”.

TopicContext (draft)In SENTBeton tools
ReportReady-mix concrete runs by mixer trucksPrepared processes and submission linked to the WZ
GPS / OBUAssumed exemption for mixer trucksConfiguration with no locator requirement
MeasureVolume (m³), mass by densitym³ in the e-WZ and in report data
PUESC outageEmergency procedure / WZ documentOutage mode + resubmission once the gateway is back
B2C recipientPrivate customer in the draft's assumptionsConfirmation on the sender / plant side

SENTBeton provides intermediary software. The producer is responsible for the accuracy of the data and the tax consequences — see the Terms of Service for details. The wording of UD437 may change during the legislative process; we update the product to the final text.

Frequently asked questions

Answers for dispatchers, batching-plant managers and documentation staff.

Is the e-WZ already available, or is it “coming soon”?

It is available. We generate the e-WZ document today — before the mixer truck leaves — as an A4 PDF with the full mix design, technological timestamps and the SENT number. You can download a sample e-WZ and a sample POD after signing and compare them with the paper delivery ticket from your plant.

How do I enter dozens of orders at once? Is there a CSV import?

Yes — the dispatcher bulk-imports orders from a CSV file (semicolon separated, UTF-8). Only three columns marked with an asterisk are required: klient*, telefon* and adres_budowy*. The rest — the EN 206 mix design (Dmax, cement, admixtures, w/c, ZKP), technological timestamps, GPS coordinates (lat/lng — we geocode the address when you leave them blank) or a recorded water addition — are optional. Download the CSV template with three sample deliveries: complete, standard and minimal.

Does the e-WZ meet the requirements of EN 206?

Yes — we designed the document around clause 7.3 of PN-EN 206+A2:2021-08 (delivery document for ready-mixed concrete) and the national PN-B-06265. The e-WZ includes, among others, the strength and exposure classes, consistence, maximum aggregate size Dmax, cement type and class, chemical admixtures, the w/c ratio, and the National ZKP certificate number with a reference to the Construction Mark B.

What happens when the recipient tells the driver to add water on site?

In the fulfilment link or the app, the driver switches on “water added at the recipient's request” and enters the number of litres plus the name and role of the authorising person (e.g. the site manager). When signing, the recipient sees an unambiguous clause: adding water after batching without the designer's consent voids the producer's warranty for the declared strength class. The entry is clearly highlighted on the final POD; when no water was added, the document carries the formal statement “no water added on site — the mix conforms to the design”.

How do I prove the 90–120 minute limit from batching?

The e-WZ prints the batching / loading time at the plant. The driver then records the site arrival time and the start and end of unloading (the system suggests the current time). All the timestamps land on the POD, so in a complaint or expert assessment you have a record proving the mix was placed within the technological window.

What does the driver show during a roadside inspection or to the site manager?

Right from the road — without waiting for the recipient's signature — the driver has a large “Show e-WZ / SENT (PDF)” button in the fulfilment link and in the app. Today the document carries the complete EN 206 data and a preparatory-mode marker (concrete is not yet subject to SENT); once the rules take effect, the same document will show the SENT reference number and a QR code. It also works in PUESC outage mode as an emergency WZ consistent with the UD437 draft procedure.

Does a mixer truck need an OBU/ZSL locator or the SENT Monitor app?

Under the assumptions of draft bill UD437, ready-mix concrete transports by mixer trucks are to be exempt from the vehicle-location requirement. SENTBeton is configured without OBU/ZSL from the start. The draft is still in the legislative process — the final wording may change, and we will update the product to the published text.

What if the recipient is a private customer (B2C)?

The UD437 draft assumes a private customer does not have to confirm receipt in the SENT register — we collect the confirmation on the sender / plant side, as a digital signature on the recipient's or the driver's phone, together with a timestamp and the GPS coordinates of where it was signed.

How does signing work, and what about GDPR?

The recipient signs the record with a finger on the phone screen — no account needed. Before signing we display a GDPR information clause; the signature together with the date, time and geolocation lands on the POD document. We process the data in line with the Privacy Policy.

Can I plug in an ERP / batching-plant system?

Yes — the integrator API lets you create orders and dispatches from an external system, receive status webhooks and download WZ/POD documents. A test account and documentation are arranged at onboarding: kontakt@sentbeton.pl.

Early adopters — the plant list

We are looking for concrete plants that want to rehearse the e-WZ, driver links and the API before SENT on concrete becomes mandatory. No scare campaign about fines — concrete operational readiness. Write to us and we will add you to the list.

kontakt@sentbeton.pl